Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Building a wooden floor over concrete.
The obvious solution to us was to replace it with a wooden one.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Installing a hardwood floor over a concrete slab even if your home was built on a concrete slab you can still enjoy the beauty and charm of hardwood floors.
Concrete slabs may look perfectly solid and feel dry to the touch suggesting they hold very little water inside.
In commercial settings wood flooring is typically installed over a concrete floor slab.
Follow these steps to install an engineered wood floor in your home.
Building a wooden deck over a concrete one.
How to install floor joists over concrete slab step 1.
So we ve had this very sturdy but extremely plain looking concrete porch in the back of the house and we ve always wanted to make it warmer and more inviting.
Cover the dirt floor with a layer of 10 mil plastic sheeting to serve as a vapor barrier which will keep.
Experienced professionals pay close attention to managing moisture and minimizing wood floor expansion and contraction when preparing to install hardwood floors on concrete slabs.
Cut plywood panels by 2 foot by 8 foot or 4 foot by 4 foot sections.
Define the area of the concrete slab to be covered with the floor assembly and the direction you plan to run the.
Score the back of the panels half of the thickness on a 12 inch by 12 inch grid.
Materials include a minimum of 3 4 inch cd exposure 1 plywood subfloor panels 4 foot by 8 foot sheets.
Builders typically lay down a vapor barrier before they pour a concrete slab.
One of the most common but sometimes overlooked sources of moisture is in the subflooring.
How to install engineered wood over concrete engineered wood flooring offers the timeless look of hardwood but is perfect for basements and other areas where moisture can be an issue.
How to build a wood floor over a dirt floor step 1.
Despite a successful moisture check and the presence of an underground moisture barrier you still.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Level the floor with a rake and then compress the dirt with a tamp to create a solid surface.
Measure the overall length of the new floor and cut a length of 2 by 4 pressure treated lumber to this dimension.